Planning Documentation
An Bord Pleanála Board Section 51 Order
An Bord Pleanála Board CPO Order
An Bord Pleanála Inspectors Section 51 Report
An Bord Pleanála Inspectors CPO Report
An Bord Pleanála Newspaper Notices for Section 51 Approval
An Bord Pleanála Newspaper Notices for Section 51 Approval
NTA Newspaper Notice 18 April 2024
NTA Newspaper Notice 18 April 2024
NTA Newspaper Notice 18 April 2024
NTA Newspaper Notice 25 April 2024
Newspaper Notice 12th May 2022
NTA observations on the proposed scheme submissions and CPO objections
Volume 1 Non-Technical Summary
Volume 2 - Main Chapters
- Preface Volume 2
- Table of Contents Volume 2
- Glossary Volume 2
- Chapter 1 Introduction
- Chapter 2 Need for the Proposed Scheme
- Chapter 3 Consideration of Reasonable Alternatives
- Chapter 4 Proposed Scheme Description
- Chapter 5 Construction
- Chapter 6 Traffic & Transport
- Chapter 7 Air Quality
- Chapter 8 Climate
- Chapter 9 Noise & Vibration
- Chapter 10 Population
- Chapter 11 Human Health
- Chapter 12 Biodiversity
- Chapter 13 Water
- Chapter 14 Land, Soils, Geology and Hydrogeology
- Chapter 15 Archaeological & Cultural Heritage
- Chapter 16 Architectural Heritage
- Chapter 17 Landscape (Townscape) and Visual
- Chapter 18 Waste & Resources
- Chapter 19 Material Assets
- Chapter 20 Risk of Major Accidents and or Disasters
- Chapter 21 Cumulative Impacts & Environmental Interactions
- Chapter 22 Summary of Mitigation & Monitoring Measures
- Chapter 23 Summary of Significant Residual Effects
Volume 3 - Figures: Part 1 of 2
Chapter 4 Proposed Scheme Description
- 1. Site Location Plan
- 2. General Arrangement
- 3. Mainline Plan and Profile
- 4. Typical Cross Sections
- 5. Landscaping General Arrangement
- 6. Pavement Treatment Plans
- 7. Fencing and Boundary Treatment
- 8. Traffic Signs and Road Markings
- 9. Street Lighting
- 10. Junction Systems Design
- 11. Proposed Surface Water Drainage Works
- 12. IW Foul Sewer Asset Alterations
- 13. ESB Asset Alterations
- 14. GNI Asset Alterations
- 15. IW Water Asset Alterations
- 16. Telecommunications Asset Alterations
- 17. Combined Existing Utilities Records
- 18. Bridges and Major Retaining Structures
Volume 3 - Figures: Part 2 of 2
Chapter 5 Construction
Chapter 6 Traffic and Transport
Chapter 7 Air Quality
Chapter 9 Noise and Vibration
Chapter 10 Population
Chapter 11 Human Health
Chapter 12 Biodiversity
Chapter 13 Water
Chapter 14 Land, Soils, Geology and Hydrogeology
Chapter 15 Archeology and Cultural Heritage
Chapter 16 Architectural Heritage
Chapter 17 Landscape and Visual
Chapter 18 Waste and Resources
Chapter 21 Cumulative Impacts
Volume 4 Appendices Part 1 of 4
Chapter 2 Need for the Proposed Scheme Appendices
Chapter 4 Proposed Scheme Description Appendix
Chapter 5 Construction Appendix
Volume 4 Appendices Part 2 of 4
Chapter 6 Traffic and Transport Appendices
Volume 4 Appendices Part 3 of 4
Chapter 7 Air Quality Appendix
Chapter 8 Climate Appendix
Chapter 9 Noise and Vibration Appendices
Chapter 10 Population Appendices
Chapter 12 Biodiversity Appendix
Chapter 13 Water Appendices
Chapter 14 Land, Soils, Geology and Hydrogeology Appendices
Chapter 15 Archeology and Cultural Heritage Appendices
Volume 4 Appendices: Part 4 of 4
Chapter 16 Architectural Heritage Appendix
Chapter 17 Landscape (Townscape) and Visual Appendix
Chapter 18 Waste and Resources Appendices
Chapter 20 Risk of Major Accidents and or Disasters Appendices
Chapter 21 Cumulative Impacts Appendices
Main Report
Figures
Appendices
Location Maps
Preferred Route Option Report
Preferred Route Option Report Appendices
- Appendix A - General Arrangement Drawings
- Appendix B - Public Consultation Submission Report
- Appendix B1 - UCD Ballsbridge to City Centre Core Bus Corridor 1st Non Statutory Public Consultation Report
- Appendix B2 - Blackrock to Merrion Core Bus Corridor 1st Non Statutory Public Consultation Report
- Appendix C1 - UCD Ballsbridge to City Centre Core Bus Corridor 2nd and 3rd Non Statutory Public Consultation Report
- Appendix C2 - Blackrock to Merrion Core Bus Corridor 2nd and 3rd Non Statutory Public Consultation Report
- Appendix D - Section 1a UCD Ballsbridge to City Centre Section Options Assessment MCA Table
- Appendix E - Section 1b UCD Ballsbridge to City Centre Section Options Assessment MCA Table
- Appendix F - Section 1c UCD Ballsbridge to City Centre Section Options Assessment MCA Table
- Appendix G - Section 2 UCD Ballsbridge to City Centre Section Options Assessment MCA Table
- Appendix H1 - Dun Laoghaire to City Centre Core Bus Corridor Options Study Feasibility and Options Assessment Report
- Appendix H2 - Ballsbridge to UCD Bus Corridor Route Options Assessment
- Appendix I1 - UCD Ballsbridge to City Centre Core Bus Corridor 1st Non-Statutory Public Consultation Brochure
- Appendix I2 - Blackrock to Merrion Core Bus Corridor 1st Non-Statutory Public Consultation Brochure
- Appendix J1 - UCD Ballsbridge to City Centre Core Bus Corridor 2nd Non-Statutory Public Consultation Brochure
- Appendix J2 - Blackrock to Merrion Core Bus Corridor 2nd Non-Statutory Public Consultation Brochure
- Appendix K1 - UCD Ballsbridge to City Centre Core Bus Corridor 3rd Non-Statutory Public Consultation Brochure
- Appendix K2 - Blackrock to Merrion Core Bus Corridor 3rd Non-Statutory Public Consultation Brochure
Preliminary Design Report
Preliminary Design Report Appendices
- Appendix A - Designers Risk Assessment
- Appendix B - Contents Sheet
- Appendix B1 - Site Location Map and Site Location Plan
- Appendix B2 - General Arrangement
- Appendix B3 - Mainline Plan and Profile
- Appendix B4 - Typical Cross Sections
- Appendix B5 - Landscaping General Arrangement
- Appendix B6 - Pavement Treatment Plans
- Appendix B7 - Fencing and Boundary Treatment
- Appendix B8 - Traffic Signs and Road Markings
- Appendix B9 - Street Lighting
- Appendix B10 - Junction Systems Design
- Appendix B11 - Proposed Surface Water Drainage Works
- Appendix B12 - IW Foul Sewer Asset Alterations
- Appendix B13 - ESB Asset Alterations
- Appendix B14 - GNI Asset Alterations
- Appendix B15 - IW Water Asset Alterations
- Appendix B16 - Telecommunications Asset Alterations
- Appendix B17 - Combined Existing Utilities Records
- Appendix B18 - Bridges and Major Retaining Structures
- Appendix C - Deviations Departures Relaxation from Standards
- Appendix D - Arboricultural Impact Assessment Report
- Appendix E - Ground Investigation Report
- Appendix F - Not used
- Appendix G - Parking Survey Report
- Appendix H - Bus Stop Review Report
- Appendix I1 - Accessibility Audit Report
- Appendix I2 - Accessibility Designers Response
- Appendix J - Preliminary Design Report - Retaining Walls
- Appendix K - Drainage Design Basis Document
- Appendix L - Junction Design Report
- Appendix M - Road Safety Audit
- Appendix N - Flood Risk Assessment
- Appendix O - Preliminary Design Guidance Booklet